
Bathrooms: showers, tubs and vanities done right the first time
From a vanity-and-tile refresh to a full redesign, with the waterproofing underneath done properly so the beautiful part lasts: showers, tubs, fixtures, lighting and ventilation.
What's included
- Tub-to-shower conversions, walk-in and curbless showers, frameless glass
- Floating and furniture vanities, double sinks, backlit mirrors
- Large-format marble-look porcelain, mosaic floors, built-in niches
- Freestanding tubs, rain and handheld sets, body jets
- Permits pulled under our GC license; plumbing and electrical to code
Before & after
Drag the handle on each photo.

Vanity. Single granite sink and oak cabinet replaced with a double-sink vanity, marble-look countertop, brushed-gold faucets and a backlit mirror.

Full bath. 1980s laminate vanity, 4-inch tile and a framed sliding door replaced with a grey shaker vanity, quartz-look top, backlit mirror, large-format marble-look porcelain on floor and tub surround, a built-in niche and a frameless glass enclosure.

Tub to walk-in shower. Almond tub, curtain and Hollywood vanity lights replaced with a frameless walk-in shower, lit niche, matte-black rain and handheld set, floating vanity and backlit mirror.
Recent bathroom remodels
Light marble-look porcelain or dramatic black and gold, floating vanities, vessel sinks, freestanding tubs, rain showers with body jets, backlit mirrors, built-in niches and frameless glass.




















Why remodel with a roofing company?
Because we were already the contractor you trusted with the most important part of the house.
Licensed general contractor
Remodeling is done under Florida general contractor license CGC1525978, not a handyman arrangement. Permits pulled, inspections passed.
The same crews and office
The team that has finished 2,000+ roofing, window and remodeling projects runs your kitchen: one project manager, one schedule, one number to call.
Written scope and price
Line-item scope, allowances for finishes you pick, and a schedule before we start. Changes are priced in writing before they happen.
Financing that fits
Kitchens and bathrooms don't qualify for PACE, so we offer GoodLeap and Service Finance loans from 9.99% APR, and we'll tell you up front which improvements PACE does cover.
How a project runs
- 1
Consultation
We visit, listen, measure and talk budget. You get a realistic range the same week.
- 2
Design & selections
Layout, finishes and fixtures chosen with you; written scope and schedule.
- 3
Permit & build
We pull permits and run the trades. Daily clean-up, weekly progress updates.
- 4
Walkthrough
Punch list, final inspection, warranty paperwork.
Bathrooms questions
How long does a bathroom take?
Most bathrooms are 2–4 weeks on site. The glass enclosure is measured after tile and takes about two weeks to arrive, which is usually the last item.
Can you keep the layout and just update finishes?
Yes, and it is the fastest, least expensive path: new tile, vanity, fixtures and glass in the existing footprint, usually without moving plumbing.
Can I finance a bathroom?
Yes, through GoodLeap or Service Finance: fixed rates from 9.99% APR, 5–20 years, $0 down.
